Jeffrey Gifaldi
Code Enforcement Officer
Phone: 585-589-4592 ext. 20
Fax: 585-589-0039
Email: codes@townofgaines.org
Permit Applications:
Planning and Zoning Documents
Non-Refundable Processing Fee Schedule
- Houses and Garages*
- Commercial Buildings*
- Multiple Housing*
- Addition to Permanent Structures*
- Agricultural Buildings*
- Bank Inspections
- Replace Roof
- Chimneys & Wood Burning Stoves
- Porches, Decks & Gazebos
- Swimming Pool (Above- Ground)
- Swimming Pool (In-Ground)
- Storage Buildings
- Fences
- Signs
- Subdivision Review (Minor)
- Subdivision Review (Major)
- Special Use Permit (RA District)
- Special Use Permit (C & CH District)
- Site Plan Review (Minor – Type 2SEQR)
- Site Plan Review (Major – Type 1SEQR)
- Telecommunications Tower (All District)
- MET Tower***
- MET Tower (1 Year Renewal)
- Variance Permit
- Document Copy Charge (Per Page)
- Development Manual
- Replacement Roof
- Permanent Back-up Generator (Up to 10 kw)
- Replacement Back-up Generator (Up to 12 kw)
- Solar Panel Permit – Roof to Installation
- Solar Panel Permit – Stand Alone Unit
- WECS Special Use Permit for towers in an Ag District – over 121 feet
- WECS Site Plan review for towers in an Ag District – over 121 feet
- WECS Special Use Permit – Residential & Commercial Towers up to 80 feet
- Demolition – Removal
- Outside Wood Burning Boilers
- Development Manual
- Town Zoning Ordinance
- $30.00 plus .15 / SQ FT
- $30.00 plus .15 / SQ FT
- $100.00 plus .15 / SQ FT
- $30.00 plus .15 / SQ FT
- $50.00 plus $1.00 / Thousand SQ FT
- $100.00
- $30.00
- $30.00
- $30.00 plus .15 / SQ FT
- $30.00
- $50.00
- $30.00 plus .15 / SQ FT
- $30.00
- $30.00
- $50.00 plus $15.00 / Lot (Site Plan Review not included)
- $250.00 plus $15.00 / Lot (Site Plan Review not included)
- $50.00 (Includes Minor Site Plan Review)
- $250.00 (Includes Minor Site Plan Review)
- $50.00
- $250.00**
- $2,500.00** (Includes Major Site Plan Review)
- $5,000.00** (Includes Major Site Plan Review)
- $2,500.00
- $50.00
- $00.25
- $35.00
- $30.00
- $30.00
- $100.00
- $50.00
- $50.00
- $150.00***
- $150.00***
- $150.00***
- $30.00
- $30.00
- $35.55
- $25.00
* Site Plan Review is required and does not include fee for “Site Plan Review”
** 20% of the fee will be applied toward the Town of Gaines cost for an Engineer to review an Applicant’s Site Plan and/or Project. Any Engineer fees that exceed 20% of the above scheduled fee will be borne the applicant.
*** $5,000.00 for the first “MET” tower by an applicant, $2,500.00 for the 2nd, 3rd and 4th “MET” tower by the same applicant.
All fees must be paid at the time of submitting an application and are non-refundable.
Make checks payable to the “Town of Gaines.”